|
KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office -- General Publications >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/1984/1283
|
Full metadata record
| DC Field | Value | Language |
| contributor.author | Kansas Water Office | - |
| contributor.author | Kansas Water Authority | - |
| contributor.author | US Army Corps of Engineers | - |
| date.accessioned | 2009-08-31T19:19:56Z | - |
| date.available | 2009-08-31T19:19:56Z | - |
| date.issued | 2007-01 | - |
| identifier.uri | http://hdl.handle.net/1984/1283 | - |
| description | The following analysis documents the second of two phases of specifically authorized planning studies. This second phase is an interim feasibility study, the nature of which also changed to a watershed management plan. The purpose of the management plan was to identify and evaluate solutions to reservoir and watershed problems identified by the Kansas Water Office and the city of El Dorado that could be implemented in small steps all leading toward long term watershed objectives. | en |
| format.extent | 17939572 bytes | - |
| format.mimetype | application/pdf | - |
| language.iso | English (United States) | - |
| title | Walnut River Basin, Kansas Feasibility Report: El Dorado Lake, Kansas Watershed Management Plan | en |
| title.alternative | El Dorado Lake, Kansas Watershed Management Plan | en |
| type | | en |
| Appears in Collections: | Kansas Water Office -- General Publications
|
Files in This Item:
| File |
Size | Format |
| 5.Feasibility Report Watershed Management– El Dorado Lake.pdf | 17519Kb | Adobe PDF | View/Open |
|
Show simple item record
All items in KSPACe are protected by copyright, with all rights reserved.
|