|
KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office--Project: Upper Neosho River Streambank Stabilization >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/1984/18469
|
Full metadata record
| DC Field | Value | Language |
| contributor.author | Van Gundy, Myron | - |
| contributor.author | Watershed Institute | - |
| contributor.author | Browning Environmental Solutions | - |
| contributor.author | Kansas Forest Service | - |
| contributor.other | United States. American Recovery and Reinvestment Act of 2009 | en |
| date.accessioned | 2011-09-10T17:14:49Z | - |
| date.available | 2011-09-10T17:14:49Z | - |
| date.issued | 2011 | - |
| identifier.uri | http://hdl.handle.net/1984/18469 | - |
| description | Includes plans, specifications, drawings, final report, and photos of the steambank stabilization project at Site 21, located in the NW 1/4 Section 24, Township 19 South, Range 12 East (Lyon County, Kan.) | en |
| format.extent | 3975938 bytes | - |
| format.extent | 5092478 bytes | - |
| format.extent | 3007740 bytes | - |
| format.extent | 994239 bytes | - |
| format.extent | 19453015 bytes | - |
| format.extent | 9756127 bytes | - |
| format.extent | 236780 bytes | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| language.iso | English (United States) | - |
| subject.lcsh | Neosho River (Kan. and Okla.) | en |
| subject.lcsh | Riparian restoration -- Kansas | en |
| subject.lcsh | Stream restoration -- Kansas | en |
| title | Site 21, Neosho River, Lyon County, Kansas NW 1/4 Section 24, T19S, R12E: Upper Neosho River Streambank Stabilization Project | en |
| title.alternative | Site 21, Neosho Streambank Stabilization Project | en |
| type | | en |
| Appears in Collections: | Kansas Water Office--Project: Upper Neosho River Streambank Stabilization
|
Files in This Item:
| File |
Description |
Size | Format |
| ARRA_Neosho_Site21_Photos_PostConstruction_May2011.pdf | Photographs--post construction | 231Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site21_Photos_Pre-Construction.pdf | Photographs--before construction | 9527Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site21_Myron Van Gundy_Final Report_011011_sm.pdf | Final report | 18997Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site12_Rpt_RiparianPlantingPlan_120910_sm.pdf | Tree planting plan | 970Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site21_Myron Van Gundy_As Built_Map011011_sm.pdf | As Built--post construction drawings | 2937Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site21_Specification Notebook_Rpt100209_sm.pdf | Specification notebook | 4973Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site21_Project Design Plans_Fig100209_sm.pdf | Project design plans | 3882Kb | Adobe PDF | View/Open |
|
Show simple item record
All items in KSPACe are protected by copyright, with all rights reserved.
|