KSPACe  

KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office--Project: Upper Neosho River Streambank Stabilization >

Please use this identifier to cite or link to this item: http://hdl.handle.net/1984/18470

Full metadata record

DC FieldValueLanguage
contributor.authorWilhite, Charles-
contributor.authorWatershed Institute-
contributor.authorBrowning Environmental Solutions-
contributor.otherUnited States. American Recovery and Reinvestment Act of 2009en
date.accessioned2011-09-10T17:15:55Z-
date.available2011-09-10T17:15:55Z-
date.issued2011-01-
identifier.urihttp://hdl.handle.net/1984/18470-
descriptionIncludes plans, specifications, drawings, final report, and photos of the steambank stabilization project at Site 19, located in the SW 1/4 Section 24, Township 19 South, Range 12 East (Lyon County, Kan.)en
format.extent3866083 bytes-
format.extent6583268 bytes-
format.extent2071837 bytes-
format.extent360411 bytes-
format.extent928847 bytes-
format.extent2727718 bytes-
format.extent21620550 bytes-
format.extent12830780 bytes-
format.extent2021069 bytes-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
language.isoEnglish (United States)-
subject.lcshNeosho River (Kan. and Okla.)en
subject.lcshRiparian restoration -- Kansasen
subject.lcshStream restoration -- Kansasen
titleSite 19, Neosho River, Lyon County, Kansas, SW 1/4 Section 24, T19S, R12E: Upper Neosho River Streambank Stabilization Projecten
title.alternativeSite 19, Neosho Streambank Stabilization Projecten
typeen
Appears in Collections:Kansas Water Office--Project: Upper Neosho River Streambank Stabilization

Files in This Item:

File Description SizeFormat
ARRA_Neosho_Site19_Planting Plans_Rpt021011.pdfTree planting plan907KbAdobe PDFView/Open
ARRA_Neosho_Site19_SpecsAddendum1.pdfSpecification addendum number 1, Dec. 16, 2009351KbAdobe PDFView/Open
ARRA_Neosho_Site19_RevPlanDrawing.pdfRevised plan drawing2023KbAdobe PDFView/Open
ARRA_Neosho_Site19_Specification Notebook_Rpt100209_sm.pdfSpecification notebook6428KbAdobe PDFView/Open
ARRA_Neosho_Site19_Project Design Plans_Rpt100209_sm.pdfProject design plans3775KbAdobe PDFView/Open
ARRA_Neosho_Site19_Photos_Post_Construction.pdfPhotographs--post construction1973KbAdobe PDFView/Open
ARRA_Neosho_Site19_Photos_Pre-Construction.pdfPhotographs--before construction12530KbAdobe PDFView/Open
ARRA_Neosho_Site19_Charles Wilhite_Final Report_012811_sm.pdfFinal report21113KbAdobe PDFView/Open
ARRA_Neosho_Site19_Charles Wilhite_As Built_Map012811_sm.pdfAs Built--post construction drawings2663KbAdobe PDFView/Open

Show simple item record

All items in KSPACe are protected by copyright, with all rights reserved.

Feedback