KSPACe  

KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office--Project: Upper Neosho River Streambank Stabilization >

Please use this identifier to cite or link to this item: http://hdl.handle.net/1984/18471

Title: Site 22, Neosho River, Lyon County, Kansas NE 1/4 Section 24, T19S, R12E: Upper Neosho River Streambank Stabilization Project
Other Titles: Site 22, Neosho Streambank Stabilization Project
Authors: Pearson, Donald
Watershed Institute
Browning Environmental Solutions
Kansas Forest Service
United States. American Recovery and Reinvestment Act of 2009
Issue Date: 2011
Description: Includes plans, specifications, drawings, final report, and photos of the steambank stabilization project at Site 22, located in the NE 1/4 Section 24, Township 19 South, Range 12 East (Lyon County, Kan.)
URI: http://hdl.handle.net/1984/18471
Appears in Collections:Kansas Water Office--Project: Upper Neosho River Streambank Stabilization

Files in This Item:

File Description SizeFormat
ARRA_Neosho_Site22_Project Design Plans_Fig100209_sm.pdfProject design plans7511KbAdobe PDFView/Open
ARRA_Neosho_Site22_Photos_PostConstruction_May2011.pdfPhotographs--post construction1098KbAdobe PDFView/Open
ARRA_Neosho_Site22_Photos_DuringConstruction_112510_sm.pdfPhotographs--during construction917KbAdobe PDFView/Open
ARRA_Neosho_Site22_Photos_Pre-Construction.pdfPhotographs--before construction12407KbAdobe PDFView/Open
ARRA_Neosho_Site22_Donald Pearson_Final Report_012011_sm.pdfFinal report25633KbAdobe PDFView/Open
ARRA_Neosho_Site22_Donald Pearson_As Built_Map012011_sm.pdfAs Built--post construction drawings5959KbAdobe PDFView/Open
ARRA_Neosho_Site22_Planting Plans_Rpt021011.pdfTree planting plan1112KbAdobe PDFView/Open
ARRA_Neosho_Site22_Specification Notebook_Rpt100209_sm.pdfSpecification notebook4029KbAdobe PDFView/Open

Show full item record

All items in KSPACe are protected by copyright, with all rights reserved.

Feedback