|
KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office--Project: Upper Neosho River Streambank Stabilization >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/1984/18473
|
Full metadata record
| DC Field | Value | Language |
| contributor.author | Evans, John | - |
| contributor.author | Watershed Institute | - |
| contributor.author | Browning Environmental Solutions | - |
| contributor.author | Kansas Forest Service | - |
| contributor.other | United States. American Recovery and Reinvestment Act of 2009 | en |
| date.accessioned | 2011-09-10T17:18:31Z | - |
| date.available | 2011-09-10T17:18:31Z | - |
| date.issued | 2011 | - |
| identifier.uri | http://hdl.handle.net/1984/18473 | - |
| description | Includes plans, specifications, drawings, final report, and photos of the steambank stabilization project at Site 24, located in the NE 1/4 Section 30, Township 19 South, Range 13 East (Lyon County, Kan.) | en |
| format.extent | 5490269 bytes | - |
| format.extent | 6693226 bytes | - |
| format.extent | 991950 bytes | - |
| format.extent | 4470487 bytes | - |
| format.extent | 23914421 bytes | - |
| format.extent | 3272331 bytes | - |
| format.extent | 695312 bytes | - |
| format.extent | 1569874 bytes | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| format.mimetype | application/pdf | - |
| language.iso | English (United States) | - |
| subject.lcsh | Neosho River (Kan. and Okla.) | en |
| subject.lcsh | Riparian restoration -- Kansas | en |
| subject.lcsh | Stream restoration -- Kansas | en |
| title | Site 24, Neosho River, Lyon County, Kansas NE 1/4 Section 30, T19S, R13E: Upper Neosho River Streambank Stabilization Project | en |
| title.alternative | Site 24, Neosho Streambank Stabilization Project | en |
| type | | en |
| Appears in Collections: | Kansas Water Office--Project: Upper Neosho River Streambank Stabilization
|
Files in This Item:
| File |
Description |
Size | Format |
| ARRA_Neosho_Site24_Photos_CompletedConstruction_101810_sm.pdf | Photographs--post construction | 1533Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_Photos_ConstructionStarted_101310_am.pdf | Photographs--during construction | 679Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_Photos_Pre-Construction.pdf | Photographs--before construction | 3195Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_Final Report_John Evans_011011_sm.pdf | Final report | 23353Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_As Built_John Evans_Map011011_sm.pdf | As Built--post construction drawings | 4365Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_RiparianPlantingPlan_Rpt120910_sm.pdf | Tree planting plan | 968Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_Specification Notebook_Rpt100209_sm.pdf | Specification notebook | 6536Kb | Adobe PDF | View/Open | | ARRA_Neosho_Site24_Project Design Plans_Fig100209_sm.pdf | Project design plans | 5361Kb | Adobe PDF | View/Open |
|
Show simple item record
All items in KSPACe are protected by copyright, with all rights reserved.
|