KSPACe  

KSPACe >
Water Office, Kansas (KWO) >
Kansas Water Office--Project: Upper Neosho River Streambank Stabilization >

Please use this identifier to cite or link to this item: http://hdl.handle.net/1984/18473

Full metadata record

DC FieldValueLanguage
contributor.authorEvans, John-
contributor.authorWatershed Institute-
contributor.authorBrowning Environmental Solutions-
contributor.authorKansas Forest Service-
contributor.otherUnited States. American Recovery and Reinvestment Act of 2009en
date.accessioned2011-09-10T17:18:31Z-
date.available2011-09-10T17:18:31Z-
date.issued2011-
identifier.urihttp://hdl.handle.net/1984/18473-
descriptionIncludes plans, specifications, drawings, final report, and photos of the steambank stabilization project at Site 24, located in the NE 1/4 Section 30, Township 19 South, Range 13 East (Lyon County, Kan.)en
format.extent5490269 bytes-
format.extent6693226 bytes-
format.extent991950 bytes-
format.extent4470487 bytes-
format.extent23914421 bytes-
format.extent3272331 bytes-
format.extent695312 bytes-
format.extent1569874 bytes-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
format.mimetypeapplication/pdf-
language.isoEnglish (United States)-
subject.lcshNeosho River (Kan. and Okla.)en
subject.lcshRiparian restoration -- Kansasen
subject.lcshStream restoration -- Kansasen
titleSite 24, Neosho River, Lyon County, Kansas NE 1/4 Section 30, T19S, R13E: Upper Neosho River Streambank Stabilization Projecten
title.alternativeSite 24, Neosho Streambank Stabilization Projecten
typeen
Appears in Collections:Kansas Water Office--Project: Upper Neosho River Streambank Stabilization

Files in This Item:

File Description SizeFormat
ARRA_Neosho_Site24_Photos_CompletedConstruction_101810_sm.pdfPhotographs--post construction1533KbAdobe PDFView/Open
ARRA_Neosho_Site24_Photos_ConstructionStarted_101310_am.pdfPhotographs--during construction679KbAdobe PDFView/Open
ARRA_Neosho_Site24_Photos_Pre-Construction.pdfPhotographs--before construction3195KbAdobe PDFView/Open
ARRA_Neosho_Site24_Final Report_John Evans_011011_sm.pdfFinal report23353KbAdobe PDFView/Open
ARRA_Neosho_Site24_As Built_John Evans_Map011011_sm.pdfAs Built--post construction drawings4365KbAdobe PDFView/Open
ARRA_Neosho_Site24_RiparianPlantingPlan_Rpt120910_sm.pdfTree planting plan968KbAdobe PDFView/Open
ARRA_Neosho_Site24_Specification Notebook_Rpt100209_sm.pdfSpecification notebook6536KbAdobe PDFView/Open
ARRA_Neosho_Site24_Project Design Plans_Fig100209_sm.pdfProject design plans5361KbAdobe PDFView/Open

Show simple item record

All items in KSPACe are protected by copyright, with all rights reserved.

Feedback